Residential Complex "Bedeck Davtashen", Yerevan, Pirumyanner Street, 13 - TunMun

Residential Complex "Bedeck Davtashen"

Delivery time
IV quarter. 2024
Floors
10
House Type
Monolith
Housing class
Medium
Finishing
Finishing

Infrastructure

Stores in the building
Recreation
Playground

Parking

Underground (Places: 3)

About Residential Complex "Bedeck Davtashen"

LCD Bidek - the use of energy-saving systems and innovative technologies in construction.
In 18-storey buildings there will be 1,2 and 3-room apartments. In general, the apartments will have an area of 68-142 sq.m. And 3 underground floors intended for parking.

1200 km.m are provided for the green zone.
The project went through a series of rigorous inspections, as a result of which it received all the necessary documents on quality, as well as seismic stability.

The territory opening from the first floor of the complex to the courtyard is completely intended for primary service facilities:

Kindergarten
Children's playrooms
Laundry
Mini-market
Bakery
Pharmacy
Coffee shop

The complex will be serviced by high-class high-speed (2.5 m/s) passenger and freight elevators.
The developer has done everything for a luxurious and comfortable stay. This is evidenced by: bedrooms with a bathroom, a wide and open balcony, a spacious kitchen, high ceilings, etc. Protection will be provided by round-the-clock video surveillance, and additional security systems. An advanced fire safety and fire extinguishing system has also been developed.

The apartments will be put into operation in the following form:

Windows: with aluminum frames and heat-saving glass, floor-to-ceiling height in living rooms;
Doors: soundproof, heat-insulated;
Stairs: built with strict compliance with safety standards;
Water supply, power supply.

Penthouse apartments with higher ceilings opening to spacious balconies and spacious sliding windows from floor to ceiling, ultra-fast elevators (2/5 m/s).

About the developer

Mortgages from banks

Ameriabank

Location

Yerevan, Pirumyanner Street, 13
Delivery time
IV quarter. 2024
Floors
10
House Type
Monolith
Housing class
Medium
Finishing
Finishing
Show contacts
Developer
Bedeck
Other properties
Agent